November 24th-28th\\
Concrete Flooring has poured all of the perimeter pier footings of CVS. A Urbano has placed 3 lifts of bank run gravel in the excavated portion of the retaining wall. On 11/28/05 the first half of the retail building columns were erected and x-braces were installed by Erection and Welding.