October 10'th\\
Excavation continues on the Eastern building. Parts of the excavation that have already passed the soil bearing test are being filled with the first layer of controlled fill. The gravel that is being placed is a 3.5" minus. This material is being used as an ititial layer in order to obtain proper compaction amid an excessively rainy week. Cherenzia excavation is now delivering up to 30 truckloads a day of this material.