February 27 '06\\
A Urbano has laid two more drainage structures and three drainage manholes.
The second retaining wall has risen another two courses and plastic pipe is being cut for installation in the next course. This pipe will be filled with concrete to hold the gaurdrail posts where parking occurs at the wall.
R&S Roofing has completed nearly half of the roof on CVS.
Red Rooster Construction has completed all framing and interior sheething above the roofline of CVS and has started installing densglass on the exterior of CVS.
Red Rooster has framed openings for the lovered aluminum vents in the North and West cornice walls of CVS.
Red Rooster has begun instalation of perimeter door frames in CVS.
Beacon Electric has run their whips to the light boxes in the CVS cornice.
A Urbano has taken delivery of all drainage pipe.