January 10'th '06\\
Erection and Welding continues to weld the decking in the mezzanine of CVS. The have also welded the pour stops and 2/3 of the 4" c channels that form the backbone of the cornice atop the retail building.
Red Rooster Construction has framed the drive-thru window wall of CVS. Almost all of the exterior framing in CVS below the roof line will be done by tomorrow. Framing of the facade of the retail building has commenced.
Urbano Construction has leveled the parking area north of the two buildings.
ALW Blasting arrived today and commenced blasting for the utilities.






\\For inquiries related to General Contracting, Construction Management, Commerical and Residential Construction within CT:
ben@constructionct.com