DAILY LOG:
04.24.07//
All site drainage with the exception of roof leaders has been tied into the existing storm sewer.
3 of 4 footings have been formed.
Swale has been created at Cottage Grove Rd to existing catch basin.
Under Slab controlled fill has been brought to within 1.5' of F.F.E.










\\For inquiries related to General Contracting, Construction Management, Commerical and Residential Construction within CT:
ben@constructionct.com